When the Moving Bill Does Not Match the Quote

The final bill fights the quote when the scope changed and nobody wrote it down, or when an interstate estimate ignored the federal rules on what you may collect at delivery. Put access and extra items on the estimate before load day.

Invoice and quote side by side — when the final bill must match the promise.
Direct answer

Match the bill to the quote by listing crew, hours, truck, and access up front, and by writing any change before you do the extra work. For interstate household goods, 49 CFR 375 sets binding and non-binding rules. MovingRated is not a carrier or broker.

Start Partner Launch — 14 days or your first 3 booked moves, whichever is later. Software only. No card. No pay-per-lead and no commission.

Start Partner Launch

The argument starts before the truck moves

Customers remember the first number. Crews remember the stairs. If those two memories are not the same document, move day becomes a negotiation in a doorway. You will not win that negotiation by being louder. You win it by having written the floor, the walk, and the inventory before anyone wrapped a dresser.

Local hourly moves and interstate household-goods moves do not use the same rule book. This article keeps them apart. The labor math for a local job is on losing jobs on price. The federal text below is for interstate household goods. MovingRated is not a carrier or broker. Nothing here is a legal opinion. It is a reading of the public regulation, checked on 2026-10-13, so you know which sentence to open yourself.

What we read in 49 CFR 375

We opened the Cornell Legal Information Institute text of 49 CFR 375.401, 375.403, and 375.405, and the FMCSA page "What is a binding move estimate?" (last updated October 26, 2023 on that site). The Cornell page for 375.401 shows amendments through 87 FR 24447, April 26, 2022. Regulations change. Read the current section before you print an estimate.

Section 375.401 says you must give the individual shipper a written estimate of the total charges and indicate whether it is binding or non-binding, before you execute an order for service and bill of lading. A binding estimate "guarantees the total cost of the move based upon the quantities and services shown on your estimate." A non-binding estimate is what you believe the total will be, based on estimated weight or volume and the services requested. It is not binding on you. Final charges on a non-binding estimate are based on actual weight and the tariff. You may charge for a written binding estimate. You may not charge for a non-binding estimate. Both sides sign the estimate, and you give a dated copy.

The same section says you must determine charges for accessorial services such as elevators and long carries before you prepare the bill of lading. If you fail to ask and fail to determine those charges first, you must deliver the goods and bill the shipper after 30 days for the additional charges. That sentence is the whole "surprise stairs" problem, written as a rule.

Section 375.403 is how a binding estimate has to look. The charges on the face apply only to the services identified. If the shipper tenders additional goods or asks for services that were not on the estimate, you are not required to honor the old number. If you still service the shipment, then before loading you reaffirm the binding estimate, write a new binding estimate the shipper signs, or agree in writing to treat the old one as non-binding under 375.405. Once the shipment is loaded, failing to do that means you reaffirmed the original binding estimate. You may not collect more than that amount, except for the extra-service and impracticable-operation cases the section spells out.

Section 375.405 covers the non-binding estimate. The estimate must clearly state that the shipper will not be required to pay more than 110 percent of the non-binding estimate at the time of delivery. You may not collect more than 110 percent of the original non-binding estimate at destination, except as that section provides. FMCSA's consumer answer, updated October 26, 2023, says the same thing in plain words: under a non-binding estimate the company cannot require payment of more than 110 percent of that estimate at delivery, and a binding estimate means the customer is not required to pay more than the estimated amount at delivery for the services on that estimate. Extra items need a new binding estimate. Impracticable operations, as defined in the carrier's tariff, have a separate 15 percent cap at delivery in the sections we read. Do not collapse that into a slogan. Open 375.403(a) and 375.405(b) for the exceptions.

Sources, opened 2026-10-13: https://www.law.cornell.edu/cfr/text/49/375.401 — https://www.law.cornell.edu/cfr/text/49/375.403 — https://www.law.cornell.edu/cfr/text/49/375.405 — https://www.fmcsa.dot.gov/consumer-protection/protect-your-move/what-binding-move-estimate — https://www.fmcsa.dot.gov/consumer-protection/protect-your-move/what-happens-if-my-household-goods-mover-increases-agreed

Binding, non-binding, and the phrase "not to exceed"

The sections above use two names: binding and non-binding. They do not create a third defined term called "not-to-exceed." People in sales use "not to exceed" to mean a ceiling. On an interstate job, a binding estimate is the ceiling for the services listed on it, subject to the extra-service rules in 375.403. A non-binding estimate is not a ceiling of 100 percent. Collection at delivery is tied to 110 percent of that estimate, again with the exceptions in the section. If your sales script says "not to exceed" and your paperwork says "non-binding," you have told two stories. Pick the story the regulation allows and write that one on the estimate.

What you called itWhat 375 requires you to be clear aboutAt delivery, in short
BindingBoth sides are bound for the quantities and services on the estimate. Face of the estimate says so.FMCSA: customer is not required to pay more than the estimate at delivery for those services. Extra services follow 375.403.
Non-bindingYour reasonable estimate. Not binding on you. Final charges follow actual weight and the tariff.Estimate must say the shipper will not have to pay more than 110 percent at delivery. See 375.405 for exceptions.
"Not to exceed" as a sales phraseNot a separate label in the sections we opened. Do not use it unless the paper is actually a binding estimate.If you meant a ceiling, use the binding rules. If you meant 110 percent, say non-binding and cite the rule.

Local jobs: write the change before you do it

On a local hourly move, your contract is your words. Federal Part 375 may not apply. You still get the same dispute if the bill adds an hour the customer did not expect. Use a change line:

Change before we continue: [what is different]. Added time estimate: [hours]. Added fee: [amount or "billed at the same hourly rate"]. Customer initials: ____. Time: ____.

Do this when the garage was full, the elevator was down, or they added a second stop. Do it before the work, not on the invoice at the end. If they decline the extra, do not do the extra. A signed change is how the final bill matches the quote plus a documented difference, instead of matching a memory.

  • Photo the access if the customer agrees. A picture of a 100-foot carry beats a paragraph.
  • Note start and stop times where the customer can see them.
  • Keep the original quote attached to the bill.
  • Do not add a fee that was not named in the quote or the change line.

Damage is a different conversation

A higher bill and a damage claim are not the same form. Do not fold a scratch into the hourly total to "make it go away" without a written note. Your valuation or insurance choice belongs on the paperwork the customer saw before load, not in a text after the claim. We are not quoting a premium here. Insurance cost depends on your carrier, your limits, and your state, and this site will not invent a dollar figure for it. If you need the valuation notice on an interstate estimate, 375.401(g) points you to the Surface Transportation Board released-rates order. Get that text from the STB. Do not paste a summary you have not read.

A bill that can be explained in one minute

  1. Original quote, with the scope sentence still visible.
  2. Each change line, timed and initialed.
  3. Hours or weight, whichever the quote used.
  4. The total, and what is still owed after any deposit.

If you cannot point to a line, take the charge off or call it what it is: a charge you failed to disclose. Then fix the quote template so the next job asks the question. Deposits and who holds the money are on getting paid and deposits. The product side is the quote builder: your rates, your approval before anything is sent.

Lead sites charge per lead or take a cut of every job. MovingRated OS is one flat fee: no pay-per-lead, no commission. The Software plan is $109 a month or $1,090 a year. The trial is 14 days or your first 3 booked moves, whichever is later, no card, and it is software only. AI tools are marked coming soon on the home page until they are live.

FAQ

Does 49 CFR 375 apply to a local move inside one city?

Part 375 is the federal rule for household-goods moves in interstate commerce for individual shippers. A move that stays inside your state is not automatically under that part. Do not quote the 110 percent rule on a local hourly job unless your own contract says it.

What is the 110 percent figure?

For a non-binding interstate estimate, 49 CFR 375.405 says the estimate must state the shipper will not be required to pay more than 110 percent of the non-binding estimate at delivery, with stated exceptions. We read that on the Cornell text of section 375.405 on 2026-10-13. Open the current section before you rely on it.

Can I change the price after the truck is loaded?

On an interstate binding estimate, 49 CFR 375.401 says you may amend an estimate before loading by mutual agreement, and you may not amend it after loading. Extra items need a new written estimate before load, under the binding rules in 375.403.

Who is MovingRated in this?

MovingRated is not a carrier or broker. The software sends your quote. You are the company on the estimate.

Software plan — $109 a month, or $1,090 a year. Yearly is 10 times the monthly price. See pricing for the other local plans.

Get started on Software

Pillar and supporting posts from the calendar will land here.

Let's get you booked first

© 2026 MovingRated OS · os.movingrated.com